Technical Measurement Checks And Maintenance Ki; For Options Of 4008 Hemodialysis Systems; Technical Measurement Checks And Maintenance For Options Of 4008 Hemodialysis Systems - Fresenius Medical Care 4008 E Technical Manual

Hemodialysis machine
Table of Contents

Advertisement

2.2
Technical measurement checks and maintenance

for options of 4008 hemodialysis systems

2.2.1
Important notes
This chapter lists all necessary technical measurement checks (TMC) and preventive mainten-
ance procedures (MA).
The checks must be performed every 24 months.
After the technical measurement checks have been performed successfully, identify the medical
equipment with a mark (label). The year of the next technical measurement checks as well as the
authority or person that performed the technical measurement checks must be indicated clearly
and traceably.
Please refer to page 2-25 for the description of the technical measurement checks and mainten-
ance.
Please refer to page 2-27 for the checklist of the technical measurement checks and mainten-
ance.
Fresenius Medical Care 4008 4/09.03 (TM)
2-23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4008 b4008 h4008 s

Table of Contents