Door Wall Assembly - KidKraft BOULDER STATION Installation And Operating Instructions Manual

Play system
Table of Contents

Advertisement

Step 18: Door Wall Assembly
Part 1
A: Measure the distance between (2179) Door Post and
(2336) Centre Post to make sure it is 17-1/2". If it does not
meet this measurement loosen all bolts in (2179) Door Post
and (2336) Centre Post, move posts until you achieve this
measurement then re-tighten the bolts. (fig. 18.1)
B: On the Front Wall attach (2186) Back Front Wall to (2180)
Post, (2336) Centre Post and to both (2181) Short Posts with
4 (H2) 1/4 x 2" Hex Bolts (with lock washer, flat washer and
previously installed t-nut) and 2 (S2) #8 x 1-1/2" Wood Screws
as shown in fig. 18.2 and 18.3. Notice the screw holes are
towards the bottom of the board.
Fig. 18.3
2186
Notice screw
hole location
2181
Wood Parts
1 x
Back Front Wall 1 x 6 x 69-1/2"
2186
2180
1/4" flat
washer
1/4" lock
washer
S2
2181
2336
H2
17-1/2"
S2
Slide
Wall
H2
2186
Hardware
2 x
#8 x 1-1/2" Wood Screw
S2
4 x
1/4 x 2" Hex Bolt
H2
(1/4" lock washer, 1/4" flat washer, previously installed 1/4" t-nut)
45
Fig. 18.1
2179
Loosen
these bolts
if needed
2336
17-1/2"
Front
Fig. 18.2
Swing
Wall
2180
H2
S2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F23890

Table of Contents