Large Roof Panel Assembly - KidKraft BOULDER STATION Installation And Operating Instructions Manual

Play system
Table of Contents

Advertisement

Step 29: Large Roof Panel Assembly
Part 1
A: Place (2329) Large V Panel on its edge and have a helper hold so it is stable. Starting flush to each bottom
edge of the panel "V" carefully attach 4 Roof Valley II pieces, 2 per side (1 Left, 1 Right) as shown below, with
6 (S16) #6 x 1" Pan Screws per Roof Valley II L and 5 (S16) #6 x 1" Pan Screws per Roof Valley II R. (fig. 29.1
and 29.2)
B: Lean (2329) Large V Panel against (2304) Large Square Panel so the Large V Panel overlaps the Large
Square Panel as shown in fig. 29.4. Attach the two panels together with 6 (S3) #8 x 2-1/2" Wood Screws (3 per
side). (fig. 29.3 and 29.4)
2329
Fig. 29.1
Start
flush to
edge
Fig. 29.4
2329
Large V Panel
overlaps Large
Square Panel
Wood Parts
1 x
Large V Panel 1-1/4 x 39 x 44-1/4"
2329
1 x
2304
Large Square Panel 1-1/4 x 39 x 44-1/4"
Place on
this edge
x 2 per
S16
bottom of
Roof Valley II L
each valley
Roof Valley II R
Note: Attach 1 Left
and 1 Right Roof
Valley for both sides.
S3
x 6
2304
Hardware
6 x
#8 x 2-1/2" Wood Screw
S3
22 x
#6 x 1" Pan Screw
S16
77
Roof Valley II L
Fig. 29.2
Side View
2329
Fig. 29.3
x 3 per top of
S16
Right Side
Roof Valley II R
S16
x 4 per top of
Left Side
Start
flush to
edge
Flares out
Panel Bottom
(Corner)
2304
Other Parts
1 x Roof Valley II (Pkg of 4)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F23890

Table of Contents