Nordson ProBlue Flex Manual page 99

Adhesive melter using the oled user interface
Hide thumbs Also See for ProBlue Flex:
Table of Contents

Advertisement

(d) External 1 (x14)
(e) External 2 (x15)
E 2020 Nordson Corporation
4. (Refer to Figure 3) Connect one end of the Ethernet cable to either
(d) External 1 (X14) or (e) External 2 (X15) on the low voltage controller
and the other to your PLC.
When connected, the melter determines which protocol to use based on
the packet information.
5. Route the Ethernet cable through the knockout, and connect the other
end to your PLC.
6. (Refer to Figure 1.) Using a 4mm hex wrench, turn the latch screw (a)
clockwise to secure the eBox enclosure door.
7. Using a 3mm hex wrench, secure the eBox enclosure side panel (shown
with panel removed) (b). Connect power to the melter at the local power
disconnect switch and switch the melter On to resume normal operation.
OLED User Interface
Figure 3
93
Part 1128351_02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents