GE Voluson P8 BT16 Basic Service Manual page 533

Table of Contents

Advertisement

GE
DRAFT
DIRECTION 5723243, R
3.) Disconnect Battery power and signal cables.
Figure 8-261 Disassembling Battery power and signal cables from DPS with Battery board
4.) Open cover and replace Battery pack from DPS with Battery top cover.
Figure 8-262 Unscrewing 3 screws and replacing Battery pack from DPS with Battery top cover
8-58-5
Installation Procedure
1.) Install the new parts in the reverse order of removal.
2.) Perform:
NOTE:
When the AC power is plugged in, the system fan will be operated automatically until the battery is fully
chaged. Even though the AC power is plugged in with the full battery, the system fan will also be
operated automatically for less than one minute.
6
DRAFT (M
EVISION
FRU8-50: Replacement of Battery Pack Assy - Functional
Chapter 8 - Replacement Procedures
23, 2018)
AY
V
™ P8 / V
OLUSON
OLUSON
B
S
M
ASIC
ERVICE
Tests.
™ P6
ANUAL
8-185

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Voluson p6 bt165670023567002456699995670021

Table of Contents