Section 8-26
Replacement of the SPEAKER
8-26-1
Manpower
One person, 30 minutes
8-26-2
Tools
Philips screwdriver
8-26-3
Preparations
1.) Power Off/Shutdown the system as described in
8-26-4
Removal Procedure
1.) Remove the MAIN OPIO and SUB OPIO. Refer to the
2.) Disconnect the 2 SPEAKER CONNECTORS. Refer to the figure below.
3.) Unscrew each 3 screws of SPEAKER ASSY L, R and remove. Refer to the figure below.
8-26-5
Installation Procedure
1.) Install the new parts in the reverse order of removal.
2.) Perform:
6
DRAFT (M
EVISION
Figure 8-136 Disconnecting SPEAKER CONNECTOR
Figure 8-137 Unscrewing 6 screws to separate SPEAKER ASSY
FRU8-11: Replacement of the SPEAKER - Functional Tests.
Chapter 8 - Replacement Procedures
23, 2018)
AY
4-3-2 on page
Section 8-25 on page 8-87
V
™ P8 / V
OLUSON
OLUSON
B
S
ASIC
ERVICE
4-4.
OPIO.
™ P6
M
ANUAL
8-91

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Voluson p6 bt165670023567002456699995670021

Table of Contents