GE
RAFT
DIRECTION 5723243, R
Section 8-30
Replacement of the Probe Holder(KIT)
8-30-1
Manpower
One person, 1 minutes
8-30-2
Tools
None
8-30-3
Removal Procedure
1.) Remove 5 probe holders. Refer to the figure below.
8-30-4
Installation Procedure
1.) Install the new parts in the reverse order of removal.
8-100
6
DRAFT (M
EVISION
Figure 8-147 Removing the 5 PROBE HOLDERs
Section 8-30 - Replacement of the Probe Holder(KIT)
23, 2018)
AY
V
™ P8 / V
OLUSON
OLUSON
B
S
M
ASIC
ERVICE
™ P6
ANUAL