Machinery Safety Directive And Ce Marking - Eaton RAMO5 Manual

For rapid link 5
Hide thumbs Also See for RAMO5:
Table of Contents

Advertisement

1 Rapid Link system 5
1.7 Proper use

1.7.2 Machinery Safety Directive and CE marking

28
After installation in a machine, the RAMO and RASP must not be taken into
operation until the associated machine has been confirmed to comply with
the safety requirements of Machinery Safety Directive (MSD) 2006/42/EEC
(meets the requirements of EN 60204). The user is responsible for ensuring
the machine's usage is in compliance with EC Directives.
The CE labels applied to the RAMO5 and RASP5 variable frequency drives
confirm that the devices comply with the Low Voltage Directive (2014/35/EC)
and the Electromagnetic Compatibility (EMC) Directive (2014/30/EC).
The RASP5 devices with STO function also comply with the Machinery
Directive 2006/42/EC.
At the output of RAMO5 and RASP5 you must not:
connect several motors,
connect a voltage or capacitive loads (for example phase-
balancing capacitors),
connect multiple RAMO5 and RASP5 in parallel,
make a direct connection to the input (bypass).
The technical data and connection conditions must be observed.
For additional information, see the nameplate of RAMO5 or RASP5 and the
documentation.
Any other usage constitutes improper use.
Rapid Link 5 · RAMO5 · RASP5 10/19 MN034004EN www.eaton.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rasp5

Table of Contents