Electrical Installation; Power Bus - Eaton RAMO5 Manual

For rapid link 5
Hide thumbs Also See for RAMO5:
Table of Contents

Advertisement

3.3 Electrical Installation

3.4 Power bus

DANGER
Electric shock hazard - risk of injuries!
Carry out wiring work only if the unit is de-energized.
ATTENTION
Fire hazard!
Only use cables, circuit-breakers, and contactors that feature
the indicated permissible nominal current value.
DANGER
The components in the variable frequency drive's power unit
remain energized up to five 5 minutes after the supply voltage
has been switched off (intermediate circuit capacitor discharg-
ing time).
On RASP5 the motor feeder cable must be disconnected or
work on the motor terminal box performed only after the dis-
charging time.
Complete the following steps with the specified tools and with-
out using force.
The Rapid Link system can have one of two types of power bus:
Flexible (RA-C1-7...) busbar,
Round conductor (standard cable).
Rapid Link 5 · RAMO5 · RASP5 10/19 MN034004EN www.eaton.com
3 Installation
3.3 Electrical Installation
83

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rasp5

Table of Contents