Safeline Signature Operating And Instruction Manual page 41

Table of Contents

Advertisement

NOTE
You have now set up the minimum requirements of a
performance validation system. The following items
will set up additional Performance Validation featiures.
5) 'Alarm if DUE or OVERDUE' on pages 71.
6) 'Printer Fitted' on page 72.
7) 'Printer Fixed or Portable' on page 68.
8) 'Line Identification' on page 68.
9) 'Shift report options' on page 69.
10) 'Shift report start' on page 70.
11) 'Shift report Interval' on page 70.
Step 1)
Enter the QA Inspector security code.
Step 2)
Select the QA Inspector Print Menu.
Step 3)
Select the type of printout required - either
'Print All Settings' or 'Print The Shift Report'.
Step 4)
Press the PROG/EXIT key.
4618 - 021
How to... 'Print from the keypanel'
OPERATING INSTRUCTIONS
Select the operation of the output from the detector
that gives remote warning of a Performance Test
becoming DUE or OVERDUE.
Select whether a printer is to be used.
Select whether a printer will be permanently
connected.
Enter a 4 digit identifier that will appear on all
printouts, (useful where more than one detector is
being operated).
Select what should appear on shift printouts.
Set the starting time for the automatic shift printouts.
Set the time between the automatic shift printouts.
'Entering security codes' on page 19.
'QA Inspector Print Menu' on page 72.
'QA Inspector Print Menu' on page 72.
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Signature 2

Table of Contents