WARNING
Ensure all power has been disconnected from the
detector before attempting to work on any electrical
components of the detector.

General

When installing the detector do NOT position the
power cable adjacent to other cables carrying
switched or heavy loads (this will reduce the
possibility of electrical interference affecting
detector operation).
Location and Layout of the Detector
Terminals
Access to the detector terminals is gained by
removing the power supply box lid, as detailed in the
next section.
Once the power supply box lid has been removed,
the terminals can accessed.
The layout of the terminals is shown in Figure 8.
Questions
• First time user ?
• Want some help in setting up ?
• Dont know where to start ?
Answer
Þ Use our step-by-step "guides"
turn to page 21 now!
12

ELECTRICAL INSTALLATION

INSTALLATION
!
CAUTION
The following procedure should only be carried out by
qualified Safeline personnel or qualified Safeline
agents.

Removing the Power Supply Box Lid

1)
To remove the power supply box lid, remove
the four screws.
2)
Raise the power supply box lid.
3)
Lift the power supply box lid completely
away
from the power supply box.
To refit the power supply box lid ensure that the seal
around the box lid is in place and undamaged then
carry out the above procedure in reverse order.
Wiring and circuit breaker details
Details of the power connection to the detector
power filter (where fitted) and the position and rating
of the recommended circuit breaker are shown in
Figure 9.
Arrangement of the gland assemblies for connecting
the power cable to the power supply unit are shown
in Figure 10.