AMI Hydrogen QED

Installation

3.
3.1.
Check
Installation
Electrical Wir-
ing
Power-up
Instrument
Setup
Run-in period
3.2.
Mounting re-
quirements
14
Installation

Installation Check List

 Instrument's specification must conform to the National
Electrical Code, all state and local codes, and all plant codes
and standards for electrical equipment.
 Connect the sample and waste line.
Do not switch on the Instrument until all electrical connections
are made.
 Connect all external devices like limit switches, current loops
and pumps.
 Connect power cord, see
 Open the flow regulating valve.
 Switch on power
 Adjust the sample flow to 6–20 l/h.
 Program all parameters for external devices (interface,
recorders, etc.).
 Program all parameters for instrument operation (limits,
alarms).
 Let the instrument run continuously for 1 h.

Mounting of Instrument Panel

The first part of this chapter describes the preparing and placing of
the system for use.
 The instrument must only be installed by trained personnel.
 Mount the instrument in vertical position.
 For ease of operation mount it so that the display is at eye
level.
 For the installation a kit containing the following installation
material is available:
– 4 Screws 8x60 mm
– 4 Dowels
– 4 Washers 8.4/24 mm
The instrument is only intended for indoor installation.
For dimensions see
Electrical Connections, p.
Dimensions, p. 12
17.
A-96.250.791 / 040219