3.1.
Check
Installation
Electrical Wir-
ing
Power-up
Instrument
Setup
Run-in period
3.2.
Mounting re-
quirements
14
Installation
Installation Check List
Instrument's specification must conform to the National
Electrical Code, all state and local codes, and all plant codes
and standards for electrical equipment.
Connect the sample and waste line.
Do not switch on the Instrument until all electrical connections
are made.
Connect all external devices like limit switches, current loops
and pumps.
Connect power cord, see
Open the flow regulating valve.
Switch on power
Adjust the sample flow to 6–20 l/h.
Program all parameters for external devices (interface,
recorders, etc.).
Program all parameters for instrument operation (limits,
alarms).
Let the instrument run continuously for 1 h.
Mounting of Instrument Panel
The first part of this chapter describes the preparing and placing of
the system for use.
The instrument must only be installed by trained personnel.
Mount the instrument in vertical position.
For ease of operation mount it so that the display is at eye
level.
For the installation a kit containing the following installation
material is available:
– 4 Screws 8x60 mm
– 4 Dowels
– 4 Washers 8.4/24 mm
The instrument is only intended for indoor installation.
For dimensions see
Electrical Connections, p.
Dimensions, p. 12
17.