Maintenance Schedule - BRP Rotax 915 i A Series Maintenance Manual

Aircraft engine
Table of Contents

Advertisement

Perform the following maintenance tasks at the intervals shown in the maintenance check list.
See
Chapter 05-20-00 section 25 hr.
Legend:
NOTE
If the first 3 checks (General, Differential pressure check and Spark plug) are ac-
ceptable then continue with the maintenance schedule.
If one of the first 3 checks are not acceptable, the engine must be checked and
repaired in accordance with the BRP-Rotax instructions for continued
airworthiness.
Points of Inspection
* no periodic maintenance (require-
ment after the first 25 hours of
operation)
All applicable (Alert) Service Bulletins
are complied with and documented.
All applicable SI-PAC (Service Instruc-
tion Part and Accessories) for addition-
al GENUINE-ROTAX®-parts and
accessories used on the relevant air-
craft are complied with and
documented.
Check the compression by the differen-
tial pressure method.
Test pressure________hPa (psi)
Pressure drop (% or fraction)
Cyl. #
1
2
bar/
psi
(1
use of leaded fuel more than 30% of
operation
05–20–00
Page 8
June 01 2019
BRP-Rotax
MAINTENANCE MANUAL LINE

MAINTENANCE SCHEDULE

check.
=
X
do the task
=
blank
no task required
25*
1) General note
X
X
2) Differential pressure check
3
4
Interval Operating hours
50
100
200
600
X
X
X
(1
X
Chapter
Reference
1000
12–20–00
Checking the
compression
Effectivity: 915 i A Series
Signa-
ture
Rev. 1

Advertisement

Table of Contents
loading

Table of Contents