Pitot/Aoa Probe - Installation - Eclipse EA500 Maintenance Manual

Table of Contents

Advertisement

AMM-34-10-14-041-C-801
1. General
A. This task gives the procedures to install the Pitot/Angle of Attack (AOA) probes.
2. Job Set-Up
SUBTASK AMM-34-10-10-041-C-921-001
(Refer to
Fig. 401, Sheet
A. Make sure aircraft is in the same configuration as it was when the removal task was
completed. Refer to
B. If the Pitot/AOA probe is new, check to see if a packing (support) block
with the unit.
NOTE: New assemblies may be shipped from the manufacturer with a packing block
in order to protect the device during shipping, handling and installation.
(1) It is strongly recommended that new Pitot/AOA probe(s) should be mounted to the
aircraft with the packing block
of the main plumbing line
also recommended that a Pitot cover be used on the Pitot/AOA probe as practical
during and after installation in order to provide increased protection against foreign
object damage (FOD).
EFFECTIVITY: ALL, POST MB 500-34-027 AND MB
500-34-028
EA500 Aircraft Maintenance Manual — 06-117751

PITOT/AOA PROBE - INSTALLATION

1.)
AMM-34-10-10-001-C-801 – Pitot/AOA Probes - Removal.
(1)
still in place in order to prevent pinching and kinking
(2)
and connection
© 2020 Eclipse Aerospace, Inc.
Temporary Revision No. 34-21
(1)
(3)
during the installation process. It is
is supplied
(1)
34-10-10
CONFIG C
Page 401-Inst
Sep 30/20

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EA500 and is the answer not in the manual?

Table of Contents