5.

Mechanical installation

5.1
Safety
All installation work must be carried out by qualified personnel according
to the site and equipment requirements and in compliance with
local regulations.
5.2
Overview
The installation includes the following work:
• All drives
- "5.3.8 Floor preparation" on page 97
- "5.3.9 Floor fixation" on page 97
- "5.3.10 Raw water circuit" on page 97
• Only drives with separately delivered units
- "5.4 Aligning transport units" on page 98
- "5.5 Joining transport units" on page 100
- "5.6 Joining water pipes" on page 101
- Joining the busbars
- "5.11 Installing the roof joints and the roof attachments"
on page 124
• Only for optional components
- "5.8 Installing and removing air-to-air heat exchangers"
on page 112
- "5.9 Installing the pressure relief vents" on page 121
- "5.10 Attaching the sealing tapes" on page 123
3BHS212794 E01 REV M
ACS6000 USER MANUAL
95/278