Aligning Transport Units - ABB ACS6000 User Manual

System drives
Hide thumbs Also See for ACS6000:
Table of Contents

Advertisement

5.4

Aligning transport units

This section applies to drives that are delivered in several transport units.
1. If a transport unit has water pipes, remove the protective covers from
the water pipe ends on both sides.
2. Check that a pipe joint (1) has been slid on one pipe end of two
adjoining water pipes.
3. Line-up the transport units as shown in "Appendix C – Mechanical
drawings".
Note: The units can be lined-up either beginning from the left or
the right.
3BHS212794 E01 REV M
1
ACS6000 USER MANUAL
05 MECHANICAL INSTALLATION
98/278