Emc-Correct Electrical Installation - Danfoss VLT HVAC Basic Drive FC 101 Operating Manual

Hide thumbs Also See for VLT HVAC Basic Drive FC 101:
Table of Contents

Advertisement

Operating Guide | VLT® HVAC Basic Drive FC 101
3x380–480 V
IP54
0.75 (1)
1.5 (2)
2.2 (3)
3 (4)
4 (5)
5.5 (7.5)
7.5 (10)
11 (15)
15 (20)
18.5 (25)
22 (30)
Moeller NZMB1-
A125
30 (40)
37 (50)
45 (60)
Moeller NZMB2-
A160
55 (70)
75 (100)
Moeller NZMB2-
A250
90 (125)

3.2.5 EMC-correct Electrical Installation

General points to be observed to ensure EMC-correct electrical installation:
Use only shielded/armored motor cables and shielded/armored control cables.
Ground the shield at both ends.
Avoid installation with twisted shield ends (pigtails), because it reduces the shielding effect at high frequencies. Use the cable
clamps provided.
Ensure the same potential between the drive and the ground potential of PLC.
Use star washers and galvanically conductive installation plates.
34 | Danfoss A/S © 2019.11
PKZM0-16
FRS-R-10
PKZM0-16
FRS-R-10
PKZM0-16
FRS-R-15
PKZM0-16
FRS-R-15
PKZM0-16
FRS-R-15
PKZM0-25
FRS-R-25
PKZM0-25
FRS-R-25
PKZM4-63
FRS-R-50
PKZM4-63
FRS-R-50
PKZM4-63
FRS-R-80
FRS-R-80
FRS-R-125
FRS-R-125
FRS-R-125
FRS-R-200
FRS-R-200
FRS-R-250
KTS-R-10
JKS-10
KTS-R-10
JKS-10
KTS-R-15
JKS-15
KTS-R-15
JKS-15
KTS-R-15
JKS-15
KTS-R-25
JKS-25
KTS-R-25
JKS-25
KTS-R-50
JKS-50
KTS-R-50
JKS-50
KTS-R-80
JKS-80
KTS-R-80
JKS-80
KTS-R-125
JKS-125
KTS-R-125
JKS-125
KTS-R-125
JKS-125
KTS-R-200
JKS-200
KTS-R-200
JKS-200
KTS-R-250
JKS-200
AQ275641848264en-000101 / 132R0078
Installation
JJS-10
16
JJS-10
16
JJS-15
16
JJS-15
16
JJS-15
16
JJS-25
25
JJS-25
25
JJS-50
63
JJS-50
63
JJS-80
63
JJS-80
125
JJS-125
125
JJS-125
125
JJS-125
160
JJS-200
160
JJS-200
200
JJS-200
200

Advertisement

Table of Contents
loading

Table of Contents