Waters Xevo TQ MS Operator And Maintenance Manual page 58

Table of Contents

Advertisement

2.
Close the source enclosure.
3.
Connect the probe adjuster and options cables (as required) to the
instrument's connectors.
4.
Slide closed the instrument's source interface door.
4-10
Maintenance Procedures

Advertisement

Table of Contents
loading

Table of Contents