Figure 5-2. Starting A Single Site Scale Up - Western Digital ActiveScale P100 Support Manual

Table of Contents

Advertisement

ActiveScale™ P100 Support Guide
identical, adding two scale up kits simultaneously results in link-local IP address
conflicts.
Warning: Components in the scale up kit might have newer firmware than your
existing components have. This procedure does not upgrade or downgrade any
firmware.
Warning: If a scale up/out job is already in progress, wait until the current job is
complete.
Warning: Do not start a log collection job while a scale up job is running.
1. Power up all components in the scale up kit.
2. Start the scale up wizard.
a. Click Configuration > Upgrade.
b. In the System Expansion section, scroll down to Scale Up.
c. Click Start.

Figure 5-2. Starting a single site scale up

74

Advertisement

Table of Contents
loading

Table of Contents