Figure 3-24. Admin Password; Figure 3-25. Node Successfully Shut Down Banner; Figure 3-26. Release Levers - Western Digital ActiveScale P100 Support Manual

Table of Contents

Advertisement

ActiveScale™ P100 Support Guide

Figure 3-24. Admin Password.

g. Wait for ActiveScale SM to display a notification in a green banner indicating that the node was
shut down successfully:

Figure 3-25. Node successfully shut down banner

h. Confirm that you shut down the right node by checking that its front and back LEDs are off.
2. Disconnect all the cables from the System Node.
3. Remove all of the drives from the front of the System Node. For more information, refer to the section
Removing a System Node drive
4. Unscrew the thumb screws on the front of the System Node. From this point, the removal procedure
for the System Node differs based on the mounting kit used. (1U mounting kit only, skip for 3U
mounting kits) Grasp the System Node and pull with even pressure until the System Node will not
extend further.
5. (1U mounting kit only, skip for 3U mounting kits) Unlatch the System Node from the rack.
a. Locate the release lever on the side of the System Node.
Figure 3-26.
Release Levers
b. Press the latch release levers toward the front of the System Node. The System Node is now free
from the rack and can be fully removed.
on page 32.
39

Advertisement

Table of Contents
loading

Table of Contents