Replacing System Nodes; Figure 3-22. Sfp+ Transceiver Installation - Western Digital ActiveScale P100 Support Manual

Table of Contents

Advertisement

ActiveScale™ P100 Support Guide
2. From the rear of rack with the label facing down, insert the SFP+ transceiver into the SFP+ port on the
System Node.
3. Close the latch on the SFP+ transceiver.

Figure 3-22. SFP+ transceiver installation

4. Insert both of the fiber optic cables into the replacement SFP+ transceiver.
5. Check to make sure that the activity LED on the port where the SFP+ transceiver replacement
occurred is blinking steadily. This behavior confirms that data is being transmitted along that port.

3.1.4 Replacing System Nodes

Caution: The System Node weights
handling the System Node.
Caution: Disconnect all power sources before servicing.
Caution: Verify that the power cables are not damaged. If they are damaged, they
may be a shock hazard and the system may need to be shutdown to replace the
server.
. Take precautions when
27 lbs (12.2 kg)
37

Advertisement

Table of Contents
loading

Table of Contents