Single Site Deployments; Summary Of Workflow; Run The Pre-Login Configuration Wizard (Single Site Version) - Western Digital ActiveScale X100 Installation Manual

Hide thumbs Also See for ActiveScale X100:
Table of Contents

Advertisement

ActiveScale™ X100 Installation Guide
• A laptop with the following software, data, and certificates:
– A supported web browser.
Note: ActiveScale SM is compatible with Chrome v63-65 and Firefox v57-59.
Desktop versions only.
– Valid security certificates in PEM format (required only if you plan to enable SSL for the
administrator interface, ActiveScale SM)
– Your filled-in ActiveScale X100 Site Survey.
– The configuration wizard prompts you for the local network settings you predetermined through
your ActiveScale X100 Site Survey. Please have your settings available for your reference.
• A CAT6 (RJ45) cable for connecting your laptop to the system
• 6 10GbE fiber optic cables for connecting the System Nodes to your networks in the data center. Your
fiber optic cables will connect to the system's SFP+ transceivers, which comply with the Ethernet
10GBASE-SR standard. Do not exceed the specified maximum 10GBASE-SR cable length for the
fiber optic cable type you choose. Maximum 10GBASE- SR cable lengths are:
– 300m for OM3 MMF fiber optic cables
– 400m for OM4 MMF fiber optic cables connected through duplex LC connectors

5.2 Single site deployments

This section guides you through the initial bringup of the first system in a single site deployment.
Tip: Total time estimate: 12-48 hours, depending on the capacity of the system.

5.2.1 Summary of workflow

1. Bring a laptop with all data, cables, and certificates listed in
on page 27.
2.

Run the pre-login configuration wizard (single site version)

3.
Connect the system to your networks
4.
Run the post-login configuration wizard (single site version)
5.
Verify system status
5.2.2 Run the pre-login configuration wizard (single site version)
A configuration wizard guides you through the pre-login configuration of the first system in a single site
deployment, prompting you for network and other configuration settings you predetermined through your
ActiveScale X100 Site Survey. Please have this document available for your reference.
on page 34.
on page 74.
What to bring with you to the data center
on page 28.
on page 36.
28