Millipore Milli-Q Direct 8 System User Manual page 80

Table of Contents

Advertisement

Replacing the Q-Pak Pack,
Rinsing
(continued)
Step
A TOC Curve Check should be performed when the Q-Pak Pack has been
Manual TOC
replaced. Refer to the TOC Curve Check section for more information.
Curve Check
The volumetric dispensing flow rate should be calibrated when the Q-Pak Pack
Flow Rate
has been replaced. Refer to the procedure in the Installation chapter.
Calibration
Continued
Action
2
The System must be in READY
Mode.
3
Push the plunger down on the
POD Unit.
4
Dispense water for about 10
minutes.
This flushes out any trapped air
in most of the System.
This also rinses off the
purification
media lo
the Q-Pak Pack.
5
Leave the System in REA
Mode when finished.
cated in
DY
- 80 -
Diagram

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Milli-q direct 16 system

Table of Contents