Maintenance Schedule - Millipore Milli-Q Direct 8 System User Manual

Table of Contents

Advertisement

Maintenance Schedule

Consumables
Progard Cartridge
UV Lamps
NOTE:
It is recommended to have a Millipore Servic
L
amps in the system.
T
he replacement of this lamp involves rem
i
nstructions
The instructions are included with the replacement lamp.
Cleaning/
Sanitisation
Inlet Strainer
Cartridge(s)
Calibrating the
flow rate
Flow rate
TOC Curve
Check
Indicator
Item
Maintenan
Q-Pak Pack
POD Pak
Item
UV 254 nm Lamp
UV 185 nm Lamp
for replacing these lamps are not included in this User Manual.
Item
Maintenance needed
Cleaning
Cl
RO
pH Cleaning
System
Sanitisation
Item
Maintenance needed
Recalibration
Item
Maintenance needed
TOC
Update TOC Curve
Check
ce needed
Replacement
Replacement
Replacement
Maintenance needed
Replacement
e Representative change the UV
oving the cover of the system. The
Prompted to by an LCD
message or as necessary.
cleaning
When prompted to by an LCD
2
message.
As necessary.
Contact Millipore for more
details.
New Consumable, Sensor or
change to Feed water.
See 'Calibrating the flow rate'
for more information.
New Q-Pak Pack installed, or
when prompted to by an LCD
message.
- 73 -
When
Prompted to by an LCD
message.
Prompted to by an LCD
message or as necessary.
When
Prompted to by an
LCD message.
When
When
When

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Milli-q direct 16 system

Table of Contents