Installing A Pod Pak - Millipore Milli-Q Direct 8 System User Manual

Table of Contents

Advertisement

Installing a POD Pak

The installation of a POD Pak involves 2 steps. These are:
Overview
 placing and flushing the POD Pak onto the POD Unit, and
 registering the installation of a specific POD Pak.
Follow the instructions delivered with the POD Pak.
Placing and
flushing
Follow the steps below to register the installation of the POD Pak.
Registering
Step
Action
1
Start in STANDBY Mode.
2
Select Menu.
Press
.
3
Select Maintenance.
Press
.
4
Scroll down to Install POD Pak.
Select it.
- 34 -
Diagram
Continued on next page

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Milli-q direct 16 system

Table of Contents