Millipore Milli-Q Direct 8 System User Manual page 111

Table of Contents

Advertisement

Summary of Alert messages,
Alert messages
(continued)
REPLAC
REPLACE Q-PAK PACK IN XX
DAYS
REPLACE PROGARD AND
TANK VENT FILTER
REPLACE PROGARD AND
TANK VENT FILTER IN XX
DAYS
REPLACE UV 185 NM LAMP
REPLACE UV 185 NM LAMP
IN XX DAYS
REPLACE UV 254 NM LAMP
REPLACE UV 254 NM LAMP
IN XX DAYS
RO REJECTION < SP
SERVICE VISIT OVERDUE XX
DAYS
Continued
E Q-PAK PAC
K
- 111 -
 The Syst
em has determine
Q-Pak Pack should be replaced.
 Replace the Q-Pak Pack.
 The System has de
termined that the
Q-Pak Pack should be replaced in
XX days, where X
X is 15, ..., 1.
 Replace the Q-Pak Pack.
 Th
e System has determined that the
Progard Cartridge
and the Vent Filter
should be replaced.
 Re
place the Progard Cartridge and
the Vent Filter.
 The System has determined that the
Progard Cartridge and the Vent Filt
should be replaced in XX days,
where XX is 15, ..., 1.
 Replace the Progard Cartridge and
the Vent Filter.
 The System h
as determined that the
UV 185 nm Lamp
should be
replaced.
 Contact Millipore.
 The System has determined that the
UV 185 nm Lamp should be
replaced in XX days, where XX is
15, ..., 1.
 Contact Millipore.
 The Water System has determined
that the UV 254 nm Lamp should be
replaced.
 Contact Millipore.
 The Water System has determ
that the UV 254 nm
replaced in XX days, where XX is
15, ..., 1.
 Contact Millipore.
 The RO % Rejection is below the set
point.
 Contact Millipore.
 The System has determined that a
Service Visit is overdue.
 Contact Millipore.
d that the
er
ined
Lamp should be
Continued on next page

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Milli-q direct 16 system

Table of Contents