Overview

This chapter explains how to install the System.
Purpose
This chapter contains the following topics:
Contents
Alarms generated during installation
Assembling the POD Unit
Tubing, cables and power cord
Installing the Progard Cartridge
Installing the Q-Pak Pack
Rinsing the RO Cartridges
Rinsing the Q-Pak Pack
Installing a POD Pak
Registering UV Lamp timers
Registering PERFORM RO CL2 CLEANING message
timer
Registering EXAMINE INLET STRAINER message
timer
Calibrating the Flow rate
Performing a TOC Curve Check
The steps shown below outline the sequence and major actions of a System
Summary list
installation. Please refer to this list throughout the installation.
Step
10
11
12
13
14
15

Installation

1
Put POD Arm onto POD Mast
2
Put Point Of Delivery onto POD Arm
3
Install tubing, termination plug and power cord
4
Power on the System, check date and time
5
Install the Q-Pak Pack
6
Install, and flush the Progard Cartridge
7
Flush and rinse the RO Cartridge(s)
8
Fill the Reservoir
9
Flush and rinse the Q-Pak Pack
Install and Register the POD Pak
Register the UV Lamp timers
Register the PERFORM RO CL2 CLEANING message timer
Register the EXAMINE INLET STRAINER message timer
Calibrate the Product Water flow rate
Perform a TOC Curve Check
Topic
Action
- 19 -
See Page
20
22
23
26
28
30
32
34
36
38
40
42
44

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Milli-q direct 16 system

Table of Contents