Tubing, cables and power cord,
Install the Inlet Strainer as shown here.
Feed water
Connect one end of the feed water tubing to the Inlet Strainer.
tubing to pipe
The tubings from the Water System Ports 3 and 4 are connected to the
Reservoir
Reservoir as shown here.
connections
NOTE:
The valve where the tubing from Port 3 is connected must be opened.
Open the feed water source.
Powering the
Plug the power cord into the Water System.
system
Plug the power cord into a source of electrical power.
The Main LCD shows a series of start-up screens.
Continued
- 24 -
Continued on next page