Millipore Milli-Q Direct 8 System User Manual page 79

Table of Contents

Advertisement

Replacing the Q-Pak Pack,
Placing
(continued)
Step
The Q-Pak pack, when newly installed, needs to be rinsed. This ensures
Rinsing
optimal water quality.
Step
Continued
A
ction
3
Push the Pack Locking Handle
down.
Close the left door.
4
When a new Q-Pak Pack is
installed, the screen looks like
this.
Press
.
Action
1
Locate the clear tubing and the
barbed fitting from the System
accessories bag.
Screw the barbed fitting onto
the POD Unit.
NOTE:
Do not use any white tape on
the threads of the barbed fitting.
An O-ring is located inside the
POD Unit.
Push one end of the clear
tubing onto the end of the
barbed fitting.
Place the other end of the clear
tubing into a sink.
- 79 -
Diagram
Diagram
Continued on next page

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Milli-q direct 16 system

Table of Contents