IBM 5280 Manual page 234

Distributed data system programmable data station maintenance analysis procedures
Hide thumbs Also See for 5280:
Table of Contents

Advertisement

F
3
COMMUNICATIONS MAP
NON AUTO ANSWER
PAGE
4 OF
S
018
-
Power off.
-
Remove the 38lS card.
- Check continuity between
A-D7~06
'+Data Tip' and the lead at
the
coupler.
Check continuity between A-D7D08
'+Data Ring' and the lead at the
coupler.
Is continuity good?
Y N
019
Disconnect
the internal cable
from
the
communications
MPU
card at connector A-ES-J01.
At
the
POI
connector ON THE
INTERNAL
CABLE
check
continuity
between
POI-07
'+Data Tip' and
the
lead
AT
THE COUPLER.
At
the
POI
connector ON THE
INTERNAL
continuity
CABLE
between
check
POI-23
'+Data
Ri~9'
and the
lead
AT
THE COUPLER.
Is continuity good?
Y N
H
J
K
H
J
K
MAP 3013-4
020
Disconnect
the
external
cable from
the
machine
at
connector J140.
At the Pl40 connector ON THE
EXTERNAL
CABLE
check
continuity
between
P140-09
'+Data Tip' and the lead
AT
THE COUPLER.
At the Pl40 connector ON THE
EXTERNAL
CABLE
check
continuity
between
P140-21
'+Data Ring' and the lead AT
THE COUPLER.
Is continuity good?
Y N
021
Defective external cable.
022
-
Defective internal cable.
023
Defective
communications
MPU
card (A-ES)(MIM 811).
If
a
'Ros
Patch'
cable
is
connected to the
card~
GO TO MAP 0600, ENTRY POINT A.
024
Use the
CE
meter
on
the
RXI
scale
to measure the resistance
to a ground pin.
A
short
will
read less than 20 ohms.
Measure
A-D7D06,
'Data Tip', to A-D8D08,
'Gnd'
(MIM 867, probe point C).
Is the line grounded?
Y N
S S
L M
EC840874
PEC839787
MAP 3013-4

Advertisement

Table of Contents
loading

This manual is also suitable for:

5285

Table of Contents