IBM 5280 Manual page 206

Distributed data system programmable data station maintenance analysis procedures
Hide thumbs Also See for 5280:
Table of Contents

Advertisement

y
9
045
COMMUNICATION MAP
38LS XMIT/RECV CHECK
PAGE
10 OF
20
-
Disconnect
'Telephone
Line
l'
and
'Telephone
Line
2'
wires
FROM THE WALL MOUNTED CONNECTOR.
Set the dB
meter
to
the
'600
ohm' pos i t i on.
-
Connect
meter across 'Telephone
Line l ' and 'Telephone
Line
2'
ON
THE
RECEIVING
WALL MOUNTED
CONNECTOR.
Does the db measurement look close
to the expected value
for
normal
operation?
Y N
046
Have
the
person
at
the
transmitting
station
ensure
that
his transmit dB level is
correct at
the
wall
mounted
connector.
If
his
transmit
level
is
correct, place another call to
see
if
another
connection
improves
the
r ece
i \lcd
dB
level.
If these were not the cause of
the
Dad
receive
dB
level
measurement, have the customer
place
a call to the telephone
company.
z
MAP 3011-10
047
Power off.
Disconnect external
cable
from
the PTT interface.
Check
for
an
open
line
or a
short to ground between TPI
(MIM
827)
(which is a direct line
to
TBl-9)
and
THE
END
OF
THE
EXTERNAL CABLE.
Check
for
an
open
line
or a
short to ground between TP2 (MIM
827)
(which is a direct line
to
TBl-8)
and
THE
END
OF
THE
EXTERNAL CABLE.
Did the cables checK out ok?
Y N
048
-
ChecK the cable for open lines
or
shorts
to ground from the
external
cable
interface
at
the
J140
connector (MIM 869,
probe
point
H)
to
the
PTT
connector.
Did the cables checK out oK?
Y N
049
Defective external cable.
050
Defective
internal
cable
to
the World Trade line plate.
051
Defective
plate.
World
Trade
line
EC840874
PEC839787
Z
MAP 3011-10

Advertisement

Table of Contents
loading

This manual is also suitable for:

5285

Table of Contents