IBM 5280 Manual page 223

Distributed data system programmable data station maintenance analysis procedures
Hide thumbs Also See for 5280:
Table of Contents

Advertisement

v
6
w
6
X
COMt'WN I CAT IONS
f'lAP
6
CBS COUPLER
PAGE
7 OF
13
047
-
Disconnect
the
external
cable from
the
machine
at
connector J140.
At the P140
r.onnpr.tor
ON
TH~
EXTERNAL
CABLE
check
continuity
between
P140-04
'+Off Hook'
(MIM 867,
probe
point
F)
and the Blue lead
AT THE COUPLER.
Is continuity good?
Y N
048
-
Defective external cable.
049
Defective internal cable.
OSO
-
Defective
communications
MPU
card(A-ES)(MIM 811).
If
a
'Ros
Patch'
cable
is
connected to the card,
GO TO MAP 0600, ENTRY POINT A.
051
Use the
CE
meter
on
the
RXI
scale
to measure the resistance
to a ground pin.
A
short
will
read less than 20 ohms.
Measure
A-D8B03,
'Off HOOK', to A-D8D08,
'Gnd'
(MIM 867, probe point C).
Is the line grounded?
Y N
Y
OS2
Defective
3SLS
line
adapter
card (A-D7)(MIM 812).
y
MAP 3012-7
053
Remove
the
communications
MPU
card (A-E5)(MIM 811)
Is thp
lin~
ground~d?
Y N
054
-
Disconnect
the internal cable
from the A-ES-JOI connector.
-
Use the CE meter
on
the
RXI
scale
to
measure
the
resistance to a ground pin.
A
short
will
read less than 20
ohms.
At the POI connector
ON
THE
INTERNAL
CABLE,
measure
from
POl-17
'Off
Hook',
POI-23 ,'Signal
Ground'
867, probe point E).
to
( Mlt-1
Is the line grounded?
Y N
S
S A
Z A
055
Defective communications MPU
card (A-ES)(MIM 811).
If
a
'Ros
Patch' cable is
connected to the card,
GO TO
MAP 0600,
ENTRY POINT A.
ECS40S74
PEC839787
MAP 3012-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

5285

Table of Contents