Biotek BioStack 4 Operator's Manual page 62

Microplate stacker
Table of Contents

Advertisement

40 | Chapter 2: Installation
 3. Install the shipping panel with the accompanying mounting screws and
washers. (Note the orientation of the panel to the instrument.)
 4. Lift the instrument until it is resting upright on the work surface.
 5. Grasp the shipping handles and carefully lower the BioStack into the inner
shipping box. Lower the inner sleeve into the inner shipping box.
BIOSTACK2WR: Place the gripper arm cover in its bubble bag. Put the various
accessories, power supply, and so on into one of the side compartments of the
inner sleeve.
 6. Put the corner blocks on the inner shipping box and put it into the outer
shipping box. Tape the box closed.
 7. Write the work order number in large, clear letters on the outside of the box.
Ship the box to BioTek.
BioStack™ Microplate Stacker

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BioStack 4 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Biostack seriesBiostack 3Biostack 2wr

Table of Contents

Save PDF