Beckhoff EL3773 Documentation page 146

Power monitoring oversampling terminal
Table of Contents

Advertisement

Commissioning
Fig. 164: Confirming the activation of the configuration
• Confirm new variable mapping, restart in RUN mode (Fig. Generate variable mapping + Restarting
TwinCAT in RUN mode)
Fig. 165: Generating variable mapping
Fig. 166: Restarting TwinCAT in RUN mode
• In TwinCAT PLC, under the "Project" menu, select "Rebuild all" to compile the project (Fig. Compile
project)
Fig. 167: Compile project
• In TwinCAT PLC: log in with the "F11" button, confirm loading the program (Fig. Confirming program
start), run the program with the "F5" button
146
Version: 2.5
EL3773

Advertisement

Table of Contents
loading

Table of Contents