Inspecting The Installation; Performing The Start-Up Procedure - Kohler SFGLD480 Operation & Maintenance Manual

Generator set models 750/1000rezk
Table of Contents

Advertisement

1.2. Inspecting the installation

-
Detach the hose clamps and wash any oil condensate and water out of the hose.
-
Clean the pressure control valve.

1.3. Performing the start-up procedure

-
Carry out the operations of a normal start-up (see IT-C-A-25-024e). If the red indicator is fully extended, push
it down with your finger, before starting the engine.
-
Record the crankcase pressure with the engine on load and the time (number of hours of operation) for the
next filter change. Set the control valve at an initial crankcase pressure of minus 4mbar. This valve shall not
be readjusted until the filtering cartridge is changed again; therefore, we recommend removing its operating
lever.
1
Crankcase
2
Blow-by gas breather
3
Gas recirculation filter
The graph below shows the crankcase pressure variation in relation to the hours of operation of the filtering
cartridge.
PRODUCT INFORMATION
IO-C-M-25-011e
MAINTENANCE OF THE CRANKCASE GAS
R
°C
° F
° C
1 20
° C
1 20
°F
BAR S
°C
RELATIVE PRESSURE
PRESION RELATIVA
+3 mbar
0 mbar
-4 mbar
INDEX
RECIRCULATION SYSTEM
6
R
ALTRONIC CPU-95
IGNITION SYSTEM
PART NO.
S /N
U.S . PA TENT NO.5.623.209
MUST B E I NSTA LLE D P ER FORM CP U-95 II
INST ALLECONFORMEMA NT CP U-95 II
WAR NIN G:KEEP COVE R TIGHT
R
AVER TISSE M E NT:GAR DER LE
WH ILE C IRC UITS ARE LI VE.
COUVE RCLE BIE N FERME
LORS QU E LES.
CER TIFIED
CLASS I, GROUP D, DIV .2T4
ALTRON IC,INC YOU NGSTOWN,OHIO
1
4
Pressure control valve
5
Oil return line
6
Connecting hoses
CRANKCASE PRESSURE
PRESION DE CARTER
HOURS OF OPERATION
HORAS DE FUNCIONAMIENTO
5.2.14
DATE
May 2006
O&M_2.002211.810_A_10_2016
4
3
5
2
6
Dep. 2
2/3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sfgld360

Table of Contents