1.1. Basic maintenance operations:
NEW ENGINE OR MAJOR SERVICE WORK START-UP MAINTENANCE
Jobs to be done during the initial start-up of a new engine or during the break-in phases following major overhauls (change
of cylinder liners, pistons, piston rings, cylinder heads,...). They must be carried out by KOHLER authorized Repair Shop.
Job
Interval
NA
1.2 Daily maintenance:
Minor Jobs
Job
Interval
ED
1.2.1 Continuous Pre-lubrication
In order to ensure perfect lubrication of all circuits of the engine, it is ne cessary to operate t he pre-lube pump in
the correct conditions, see IT-C-A-25-040.
1.2.2 Continuous Pre-heating
In order to guarantee a suitable oil viscosity before the start up of the engine preheating must be used according
to instruction IC-C-D-00-008. The use of water preheating improves the engine start conditions, see IC-C-D-00-
008.
1.2.3 Battery Charger
The correct function of the battery charger must be checked every day.
PRODUCT INFORMATION
IO-G-M-00-019e
MAINTENANCE OF NATURAL GAS ENGINE SFGLD
Job Description
(Operation before starting up the engine)
0 h
- General inspection and set-up of the engine
ROUTINE MAINTENANCE (Type "E")
Job Description
- Check oil pressure and temperature during the pre-lubrication phase
- Verify oil heating with the pre-heater
24 h
- Check battery acid level
- Verify water heating with the pre-heater
INDEX
G
STAND-BY
5.1.14
DATE
Dep. 2
January 2016