Vent; Expansion Tank; External Cooling System; Venting Pipes - Kohler SFGLD480 Operation & Maintenance Manual

Generator set models 750/1000rezk
Table of Contents

Advertisement

1
The
2
The
3
Purg

3.7 VENT

An element
that purges
3.8 EXPAN
SION TANK
K
Due to the i
ncreased vo
olume of heat
The expans
sion tank has
A pipe must
t run from the
All venting p
pipes on the
The expans
sion tank mu
below a min
nimum level
steam or air
r to leave at
The expans
sion tank mus
Pressurized
d expansion
cooling circ
cuit cannot b
engine temp
perature exc
ceeds 100ºC.
3.9 VENTIN
NG PIPES
This is a sys
stem of pipe
At least the
e following v

venting pipes

water level
in the tank:
Fro
m the circuit
Fro
m the highes
Fro
m the highes
3.10 EXTE
ERNAL COO
OLING SYST
This part of
the cooling c
These syste
ems may be
PRODUCT INFOR
P
IT
T-G-A-20-
ONE CIRC
O
mostates ho
ucing
mostatic Val
ves
ge
any possible
e air pockets
ted water, a
s to be install
led at the hig
e expansion
tank to the c
circuit must
lead to the e
ust be fitted
with a low w
and a safety
y valve that a
positive over
rpressure.
st have a ca
pacity of at le
tanks must b
be used in th
be reached
with cooling
.
s that avoid
air from colle
s should be
t water pump
p inlet to the e
st point of the
e cooling circ
st point of the
e external co
TEM
circuit is resp
ponsible for c
of different t
ypes, depen
RMATION
INDEX
-025e
CUIT COOL
LING SYST
s from the cir
rcuit while the
tank has to b
be installed t
ghest point o
of the cooling
circuit water
pump inlet.
expansion ta
nk below wa
water level s
sensor that d
allows air to
enter the cir
east 15% of
the total volu
hose cases w
where the m
g systems u
using unpres
ecting in the
cooling syste
installed, le
eading to the
expansion ta
ank
cuit in the en
ngine to the e
ooling circuit
to the expan
cooling the h
heat produce
nding on the
requirements
2.2.7
DATE
Sept
tember 2014
TEM FOR
GAS V-EN
O&M_2.002211.810_A_10_2016
e cooling circ
cuit is being
to control sai
id increases
circuit.
ater level.
does not allo
ow the water
rcuit at nega
ative pressure
ume of water
r in the cooli
minimum pres
ssure require
ssurised exp
pansion tank
em.
e expansion
tank, alway
expansion ta
ank
nsion tank
ed by the eng
gine.
s and applica
ation in ques
Dep.
. 2
4
NGINES
filled.
in volume.
r level to fall
l
e and water,
,
ng circuit.
ement of the
e
ks or where
e
ys below the
e
stion.
7/8
8