Oracle X6-2-HA Deployment And User's Manual page 78

Database appliance
Hide thumbs Also See for X6-2-HA:
Table of Contents

Advertisement

(Optional) After deployment of oda_base, if you want to change CPU or memory of
5.
ODA_BASE, run oakcli configure oda_base:
# oakcli configure oda_base
Core Licensing Options:
1. 2 CPU Cores
2. 4 CPU Cores
3. 6 CPU Cores
4. 8 CPU Cores
5. 10 CPU Cores
6. 12 CPU Cores
7. 14 CPU Cores
8. 16 CPU Cores
Current CPU Cores :10
Selection[1 .. 8](default 16 CPU Cores) : 5
ODA base domain memory in GB(min 16, max 244)(Current Memory
160G)[default 160] : 100
Additional vlan networks to be assigned to oda_base ? (y/n) [n]: n
Vlan network to be removed from oda_base ? (y/n) [n]: n
To ensure your changes are reflected in the system, run the oakcli restart
oda_base command.
Validate that the cabling is connected correctly.
6.
# oakcli validate -c storagetopology
The command displays errors if the cables between the two nodes and the storage
shelf or shelves are not in the correct sockets.
Caution:
Do not ignore any errors or warnings in the output. If the cabling
validation fails, connect the cables correctly and rerun the command until
the command runs without any errors or warnings. Do not deploy Oracle
Database Appliance until the cabling is correct.
If the output includes a warning for jbod nickname, then run the command from the
first node to correct the warning. Rerun the command again to verify that the
command runs without the warning.
SUCCESS : Overall Cable Validation on Node1
WARNING : JBOD0 Nickname is incorrectly set to : Oracle Database
Appliance - E1
WARNING : JBOD1 Nickname is incorrectly set to : Oracle Database
Appliance - E0
INFO
: Above details can also be found in log
file=/tmp/StorageTopology-2015-05-13-15:03:36_29149_8856.log
Connect to ODA_BASE using vncviewer or vncsession using the dom0 host name
7.
and port 5900 (test0-dom0:5900).
Use the oakcli configure firstnet to configure an initial public network on
8.
the first node (Node 0) to complete the ODA_BASE deployment.
Installing Virtualized Platform Software and Deploying the Appliance
Chapter 5
5-8

Advertisement

Table of Contents
loading

Table of Contents