Roland R1000 Series Manual page 80

Double sheet control system with integrated fieldbus interface
Hide thumbs Also See for R1000 Series:
Table of Contents

Advertisement

Start-up
For L20-XX-S:
Adjustment parameter 4: Calibration deviation
adjust parameter: 4
show calibration
deviation distance
Fig. 51: Selection of the calibration deviation
The measured deviation of the calibration sheet thickness (in mm / inch) is displayed by pressing
the ENTER key. This requires that the calibration sheet has to be inserted.
adjust parameter: 4
AB1:-0.005 mm
Fig. 52: Display of the calibration deviation
Pressing the ENTER key will close the display of the calibration deviation.
For L20-3-XX-S:
Adjustment parameter 4: System test / Alignment
According to the type of sensor used, the device performs the following check:
A)
When connecting the sensor type LAAS40+, LAAS10+ (in preparation) and LAAS200+
(in preparation) the alignment and function control of all activated sensors in the system settings
is performed.
adjust parameter: 4
system test/
alignment
Fig. 53: Display of system test / alignment
Possible selections:
yes
no
80
ROLAND ELECTRONIC GmbH · Otto-Maurer-Str. 17 · DE 75210 Keltern · Phone +49 (0)7236-9392-0 · Fax +49 (0)7236-9392-33
Double Sheet Control System R1000 series L20
with integrated fieldbus interface
no
Manual
B0063191 / 1.3

Advertisement

Table of Contents
loading

This manual is also suitable for:

L20

Table of Contents