Roland R1000 Series Manual page 45

Double sheet control system with integrated fieldbus interface
Hide thumbs Also See for R1000 Series:
Table of Contents

Advertisement

B0063191 / 1.3
6.3.6
Clear 2-sheet / Clear 0-, 1- , 2-sheet outputs
(
CLR 2-sheet /
0-sheet, 1-sheet, 2-sheet)
(Warning, 0-sheet, 1-sheet, 2-sheet)
(Warning,0-sheet, 1-sheet, 2-sheet)
Fig. 20: Timing diagram for clear sheet outputs
1)
In case of "Function fault" "Function result" is not necessarily set.
6.3.7
Calibration static (L20-XX-S only)
A static calibration is not possible with L20-3-XX-S. (L20-XX-S is in preparation)
BIN 8.2
Calibration
BOUT 8.0
Function result
1)
BOUT 8.2
Function fault
OUT 8.3
Ready
Fig. 21: Timing diagram for calibration static
1)
In case of "Function fault" = 1 "Function result" will sometimes remain at 0.
ROLAND ELECTRONIC GmbH · Otto-Maurer-Str. 17 · DE 75210 Keltern · Phone +49 (0)7236-9392-0 · Fax +49 (0)7236-9392-33
Double Sheet Control System R1000 series L20
with integrated fieldbus interface
BIN8.5
BOUT8.0
1)
Function result
BOUT8.2
Function fault
BOUT8.3
Ready
BOUT8.4 - 7
OUT 0, 1, 2, 4
Note
The measured timing periods were determined with12 Mbit/s Profibus.
These timing periods can vary with different transmission rates and bus
systems. The cycle time of the PLC has not been taken into account.
Note
The measured timing periods were determined with 12 Mbit
Profibus. These timing periods can vary with different
transmission rates and bus systems. The cycle time of the PLC
has not been taken into account.
Manual
"0" active
"0" active
< 15 ms
< 7 s
max. ? ms
Communication with the PLC
"1" if fault
0V if fault
< 15 ms
< 15 ms
max. ? ms
45