Subaru SVX 1992 Manual page 705

Hide thumbs Also See for SVX 1992:
Table of Contents

Advertisement

WHEELS AND AXLES
[W2DO] 4-2
7) Align alignment marks on free ring and trunnion and
D: ASSEMBLY
install free ring .
Use specified grease .
BJ side :
Molylex No . 2 (P/N 723223010) or Sunlight TB2-A
FTJ side:
SSG 6003
Be sure to wraps shaft splines with vinyl tape to
prevent boot from scratches .
1) Install BJ boot in specified position and fill it with 60
to 70 g (2 .12 to 2 .47 oz) of specified grease .
The inside of the larger end of BJ boot and the boot
groove must be cleaned so as to be free from grease
and other substances .
2) Place FTJ boot at the center of shaft.
3) Align alignment marks and install trunnion on shaft .
C4-342
Fig . 53
4) Install snap ring to shaft.
Confirm that the snap ring is completely fitted in the
shaft groove.
5) Fill 100 to 110 g (3 .53 to 3 .88 oz) of specified grease
into the interior of FTJ outer race .
6) Apply a coat of specified grease to free ring and
trunnion .
Fig . 54
8) Align alignment marks on shaft and outer race, and
install outer race .
C4-2161
Fig . 55
9) Install circlip in the groove on FTJ outer race .
Pull the shaft lightly and assure that the circlip is
completely fitted in the groove.
10) Apply an even coat of the specified grease 30 to 40
g (1 .06 to 1 .41 oz) to the entire inner surface of boot.
11) Install FTJ boot taking care not to twist it ..
a. The inside of the larger end of FTJ boot and the
boot groove shall be cleaned so as to be free from
grease and other substances.
21

Advertisement

Table of Contents
loading

Table of Contents