Mazda RX-8 Manual page 204

Hide thumbs Also See for RX-8:
Table of Contents

Advertisement

Drive-by-wire Control System Inspection
Engine coolant temperature compensation inspection
1. Connect the WDS or equivalent to the DLC-2.
2. Select the following PIDs:
ECT
IAT
RPM
3. Verify that the engine is cold, then start the engine.
4. Verify that the engine speed decreases as the engine warms up.
If the engine speed does not decrease or decreases slowly, inspect the following:
ECT sensor and related wiring harness
(See ENGINE COOLANT TEMPERATURE (ECT) SENSOR INSPECTION .)
Throttle body and related wiring harness
(See THROTTLE BODY INSPECTION .)
(w)
RX8-Engine Troubleshooting
Page 155

Advertisement

Table of Contents
loading

Table of Contents