Measurement Performance
Figure 10-12
Smart Meter Verification scheduler – Communicator
Online >
1 Overview >
3 Shortcuts >
6 Meter Verification
10.4

Performing meter validation

To perform meter validation, measure a sample of the process fluid and compare the measurement
with the flowmeter's reported value.
Use the following formula to calculate a meter factor:
NewMeterFactor
Valid values for meter factors range from
limits, contact Micro Motion customer service.
Example
118
1 Run Meter Verification
2 View Test Results
3 Schedule Meter Verification
3
1 Next Run
2 Set Hrs Until Next Run
3 Set Recurring Hours
4 Turn Off Schedule
=
ConfiguredMeterFactor
0.8
The flowmeter is installed and proved for the first time. The flowmeter
mass measurement is 250.27 lb; the reference device measurement is
250 lb. A mass flow meter factor is determined as follows:
The first mass flow meter factor is 0.9989.
One year later, the flowmeter is proved again. The flowmeter mass
measurement is 250.07 lb; the reference device measurement is
250.25 lb. A new mass flow meter factor is determined as follows:
MassFlowMeterFactor
The new mass flow meter factor is 0.9996.
Online >
3 Service Tools >
4 Maintenance >
1 Routine Maintenance >
3 Meter Verification
ExternalStandard
×
---------------------------------------------------------------------------------- -
ActualTransmitterMeasurement
to
. If the calculated meter factor exceeds these
1.2
MassFlowMeterFactor
1
=
=
0.9989
Micro Motion Series 1000 and Series 2000 Transmitters
250
×
----------------- -
0.9989
=
250.27
250.25
×
----------------- -
=
0.9996
250.07