Measurement Performance
Note: If you start a meter verification test from ProLink II or the Communicator, the transmitter
display shows the following message:
SENSOR
VERFY/x%
Figure 10-1
Meter verification test, original version – ProLink II
Tools >
configuration
Abort
Yes
102
Meter Verification >
Structural Integrity Method
Verify configuration
parameters
Next
Enter optional test data
Next
Initialize and start meter
verification
Start
Fault
Hold last
value
Progress bar shows
test in progress
Fail
Pass
Rerun
test?
(1)
Back
View report (option to print
Abort
Back
Next
(1) If the graph was viewed at the beginning of the
procedure, clicking Back here will return to the
No
beginning of the procedure (along the dotted
line).
(2) The results of the meter verification test are not
saved until Finish is clicked.
Micro Motion Series 1000 and Series 2000 Transmitters
View previous test data
Graph of results
Next
or save)
(2)
Finish

Advertisement

Table of Contents
loading

Table of Contents