Installing The Reactor Box (Only For The Eu Type Models); Connecting The Power Switch Cable; Installing The Power Switch - JUKI LZ-2290CS Instruction Manual

Hide thumbs Also See for LZ-2290CS:
Table of Contents

Advertisement

2-10. Installing the reactor box (Only for the EU type models)




2-11. Connecting the power switch cable

2-11-1. Installing the power switch





Electrical box
(EU type models:
Reactor box)
1) Attach the terminals of power cord ❶ coming
from the electrical box to reactor box PCB asm.
❷ and reactor box mounting plate ❸ .
Connect brown wire A to the first connector and
A
blue wire B to the third connector respectively
C
from the top of terminal block on the reactor box
B
PCB asm. using screws. Connect green/yellow
wire C to reactor box mounting plate ❸ with
earth setscrew ❹ .
2) Attach cable clip ❺ to the power cord coming
from the electrical box. Then, attach the power
cord together with the cable clip to reactor box
mounting plate ❸ with cable clip setscrew ❻ .
3) Attach cord bushes ❽ to input/output cables ❶
and ❼ of the reactor box. Attach both bushes in
the same manner.
4) Attach reactor box cover  to reactor box

mounting plate ❸ with four reactor-box cover
setscrews ❾ .
At this time, fix cord bushes ❽ attached to input/
output cables ❶ and ❼ in the concave section
on reactor box cover  to eliminate a gap be-

tween reactor box  and cover  .
5) Secure reactor box  to the undersurface of
table with four accessory wood screws  .
6) Secure two cables  coming from reactor box
 to the table with accessory cable clip  and
wood screw  .
Fix power switch ❶ under the machine table with
wood screws ❷ .
Fix the cable with staples ❸ supplied with the ma-
chine as accessories in accordance with the forms of
use.
– 8 –

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sc-956aLz-2290cs-7

Table of Contents