Installing The Reactor Box (Only For The Eu Type Models) - JUKI LU-2828V-7 Instruction Manual

Table of Contents

Advertisement

2-10. Installing the reactor box (Only for the EU type models)







1) Connect the terminals of power cord ❶ of the
SC-952 to reactor-box PCB asm. ❷ and to re-
actor box mounting plate ❸ .
Connect brown wire A to the first connector and
A
blue wire B to the third connector respectively
C
from the top of terminal block on the reactor box
B
PCB asm. using screws. Connect green/yellow
wire C to reactor box mounting plate ❸ with
earth setscrew ❹ .
Attach cable clip ❺ to the power cord of SC-
2)
952. Attach the power cord together with the
cable clip to reactor box mounting plate ❸ with
cable clip setscrew ❻ .
Attach cord bushes ❽ to input/output cables ❶
3)
and ❼ of the reactor box. Attach both bushes in
the same manner.
Attach reactor box cover  to reactor box
4)

mounting plate ❸ with four reactor-box cover
setscrews ❾ .
At this time, fix cord bushes ❽ attached to input/
output cables ❶ and ❼ in the concave section
on reactor box cover  to eliminate a gap be-

tween reactor box  and cover  .
Secure reactor box  to the undersurface of
5)
table with four accessory wood screws  .
Secure two cables  coming from reactor box
6)
 to the table with accessory cable clip  and
wood screw  .
In addition, for the models provided with the
stitch skipping detecting device and the bob-
bin-thread remaining amount detecting device,
cables coming from the stitch skipping device
control box should be secured together with the
aforementioned cables by means of the afore-
mentioned cable clip.
– 11 –

Advertisement

Table of Contents
loading

Table of Contents