2-10. Installing the reactor box (Only for the EU type models)
❸
❽
❼
❾
❷
❹
❺
❶
❸
❽
❶
❾
1) Connect the terminals of power cord ❶ of the
SC-952 to reactor-box PCB asm. ❷ and to re-
actor box mounting plate ❸ .
Connect brown wire A to the first connector and
A
blue wire B to the third connector respectively
C
from the top of terminal block on the reactor box
B
PCB asm. using screws. Connect green/yellow
❻
wire C to reactor box mounting plate ❸ with
earth setscrew ❹ .
Attach cable clip ❺ to the power cord of SC-
2)
952. Attach the power cord together with the
cable clip to reactor box mounting plate ❸ with
cable clip setscrew ❻ .
❽
Attach cord bushes ❽ to input/output cables ❶
3)
and ❼ of the reactor box. Attach both bushes in
the same manner.
Attach reactor box cover to reactor box
4)
mounting plate ❸ with four reactor-box cover
setscrews ❾ .
At this time, fix cord bushes ❽ attached to input/
output cables ❶ and ❼ in the concave section
on reactor box cover to eliminate a gap be-
tween reactor box and cover .
Secure reactor box to the undersurface of
5)
table with four accessory wood screws .
Secure two cables coming from reactor box
6)
to the table with accessory cable clip and
wood screw .
In addition, for the models provided with the
stitch skipping detecting device and the bob-
bin-thread remaining amount detecting device,
cables coming from the stitch skipping device
control box should be secured together with the
aforementioned cables by means of the afore-
mentioned cable clip.
– 11 –