9.WAVEFORM DISPLAY

9-1-1. Hold Point Plotting

By using the hold function and the graph plotting function together, the held point (red)
can be plotted.

9-1-2. X-axis and Y-axis on the Graph Plotting Screen

X-axis
The X-axis is a time setting axis. One graph screen is plotted between the start signal
input point and the X start point.
There are 200 plotting points, and typical values for the predetermined time divided by
this number of plotting points are plotted.
Y-axis
The Y-axis is a load setting value. A graph is plotted between the Y start point and the Y
end point. (There are 100 plotting points.)
68
Example) Relative maximum hold
Held
point
Y
Y End Point
100
Y Start Point
0
Plotting Range
200
D Z
X
X End Point