Agilent Technologies G2570A GC/MSD Installation And Operation Differences page 77

Table of Contents

Advertisement

3 Operational Differences
Creating GC/MSD Methods
Instrument Control View
In the Instrument Control View of a GC/MSD session using the G2570A system,
both icons and pulldown menu items for GC parameters will be inaccessible. When
loading a method that was shipped as part of the ChemStation software, always
resave the method before using it.
When choosing to Edit Entire Method, no GC parameters will be accessible.
Run Time
The run time for the MSD will always be 650 minutes. Data acquisition time is
dictated by the start and stop signals sent by the GC.
77

Advertisement

Table of Contents
loading

Table of Contents