Agilent Technologies G2570A GC/MSD Installation And Operation Differences page 47

Table of Contents

Advertisement

o
GC/control module installation and plumbing
o GC placed on an appropriate bench
o GC Control Module connected
o Carrier gas supply plumbed with copper tubing
o Plumbing purged with helium at 5 – 8 psi (35 – 55 kPa) for 5 – 10 minutes
o Gas purifier plumbed and purged
o GC plumbed
o APG start/stop cable connected to "Remote" plug
o Carrier gas line pressure set to 50 psi (345 kPa)
o
GC configuration
o GC plugged in and turned on
o GC passes self test
o GC Control Module passes self test
o GC passes inlet test
o Control Module passes keyboard test
o GC power off
o
Column outlet reconfiguration
o Place column on clean surface
o Uncoil 2 loops from outlet end of column
o Attach 2 clips onto the 1 o'clock and 3 o'clock column cage cross piece members
o Feed outlet end of column through 1 o'clock positioned clip
o Pass outlet end of column through 3 o'clock positioned clip
o Rewind remainder of column outlet around column cage
2 Hardware Installation (Differences)
Installation Checklist
47

Advertisement

Table of Contents
loading

Table of Contents