Agilent Technologies G2570A GC/MSD Installation And Operation Differences page 49

Table of Contents

Advertisement

o
MSD configuration
o MSD and foreline pump unpacked and placed on the bench
o MSD top cover removed
o Vent valve opened to equalize pressure
o PFTBA cal valve vial filled
o Plugs removed from the foreline pump
o Foreline pump line voltage verified to match available ac power
o Line voltage identification sticker installed on MSD
o Oil drip pan placed under foreline pump
o Foreline hose connected to the pump
o Pump exhaust vented to a fume hood or the oil trap installed
o Diffusion pump cap removed
o Foreline pump power cord plugged into MSD
o 59864B Ion Gauge Controller installed (accessory)
o
GC/MSD connection
o Interstitial panel installed
o GC/MS interface cable connected
o MSD positioned with interface nut in GC oven
o APG start/stop cable from GC connected to the Remote port
o MSD power cord plugged into appropriate socket
o Sideplate thumbscrews loosened completely; analyzer opened
o Blanking interface nut removed
2 Hardware Installation (Differences)
Installation Checklist
49

Advertisement

Table of Contents
loading

Table of Contents